This bridge is a 67m long, two-span, post tension cable-stayed footbridge which spans the River Moy in Ballina.
Following this we walked to the Upper Bridge - The second, the Ham bridge or Upper bridge, was built in the year 1836 by Thomas Ham at a cost of £3,000.00 and has 5 arches.
We then walked along the River Moy to the Lower Bridge. This bridge was constructed by Armstrong and West and was built in 1835 and has 4 arches.
The day was hot and it was great to reach the swimming pool for our first swimming lesson.